




Kendamil Organic Formula Stage 1
$59.99 – $599.99Price range: $59.99 through $599.99
Kendamil Stage 1 - Bio Nature Formula 800g (Cow) From Birth to 6 Months
Kendamil Stage 1 - Bio Nature Formula is crafted to provide complete nutrition or to complement breastfeeding, offering a gentle, organic formula designed to closely mimic mature breast milk. With a 60/40 whey-to-casein ratio, it supports smooth digestion and growth.Key Benefits
- Age Suitability: Tailored for infants from birth to six months.
- Formula Type: Certified organic for high-quality infant nutrition.
Nutritional Highlights
Protein Composition
- Whey-to-Casein Ratio (60/40): Similar to breast milk, with whey as the primary protein for easy digestion.
Immune-Boosting Vitamins
- Vitamin A
- Vitamin C
- Vitamin D
- Supports immune function and development
Essential Fatty Acids
- ALA, LA, ARA, DHA from plant-based sources to support brain and vision development
Milk Source
- Whole Organic Cow's Milk: Offers a natural energy source for babies.
Gentle on Little Tummies
- No starch or maltodextrin — promotes easier digestion for sensitive stomachs.
EU Certified Organic Ingredients
- Ensuring top-quality, safe nutrition for infants.
Quantity
- Each container holds 800g of formula.
Important Notice
Parents are encouraged to choose formula based on individual circumstances and in consultation with healthcare professionals. Always adhere to the recommended usage guidelines provided by the formula manufacturer.Packaging Note
Please note that this item may dent easily. We cannot offer replacements or discounts for minor dents (as replacements may also arrive dented). All products are carefully inspected and dispatched brand-new. If dents are a concern, consider box-packaged alternatives. Dented cans remain safe for use unless the powder is exposed to air. Thank you for your understanding.Ingredients
"Organic whole milk, Organic demineralised milk whey protein powder, Organic skimmed milk, Organic vegetable oils (sunflower, coconut, rapeseed), Organic galacto-oligosaccharides (from milk), Calcium citrate, Sodium citrate, Potassium chloride, Calcium lactate, Magnesium chloride, Oil from the microalgae Schizochytrium sp., Vitamin C, Potassium hydroxide, Choline bitartrate, Inositol, Oil from Mortierella alpina, Taurine, Nucleotides (cytidine-5’-monophosphate, disodium uridine-5’-monophosphate, adenosine-5’-monophosphate, disodium inosine-5-monophosphate, disodium guanosine-5’-monophosphate), Iron pyrophosphate, Zinc sulphate, Vitamin E, Niacin, Pantothenic acid, Copper sulphate, Thiamin, Riboflavin, Vitamin A, Vitamin B6, Manganese sulphate, Folic acid, Potassium iodide, Sodium selenite, Vitamin K, Vitamin D3, Biotin, Vitamin B12.
Please keep in mind that this product is made to meet European standard for iron and other nutritional criteria. Because there is no global standard for such nutritional qualities, these requirements may vary by country. Customers in Australia, Canada the United States, and China may need additional supplements to match local dietary recommendations."
Nutrition facts
| Nutrients & Vitamins | Per 100 ml or 3.38 oz/3 oz prepared |
| Energy | 277 kJ / 66 kcal |
| Fat | 3.5 g |
| - of which saturates | 1.3 g |
| - of which unsaturates | 2.3 g |
| Omega 3 | Amount |
| α-Linolenic Acid (ALA) | 55.5 mg |
| Docosahexaenoic Acid (DHA-LCP) | 16.1 mg |
| Omega 6 | Amount |
| Linoleic Acid (LA) | 582 mg |
| Arachidonic Acid (ARA) | 8 mg |
| Total Carbohydrate | 7 g |
| - of which sugars* | 6.7 g |
| - of which lactose | 6.5 g |
| Fibre | 0.23 g |
| of which Galacto-oligosaccharides | 0.22 g |
| of which 3'GL** | 0.01 g |
| Protein (N x 6.25) | 1.4 g |
| - Whey protein | 0.8 g |
| - Casein protein | 0.6 g |
| Vitamins | Amount |
| Vitamin A | 50 mcg-RE |
| Vitamin D3 | 1.3 mcg |
| Vitamin E | 1.4 mg-α-TE |
| Vitamin K | 3.6 mcg |
| Vitamin C | 9 mg |
| Thiamin | 0.06 mg |
| Riboflavin | 0.18 mg |
| Niacin | 0.6 mg |
| Vitamin B6 | 0.05 mg |
| Folate (DFE) | 19.3 mcg |
| Vitamin B12 | 0.16 mcg |
| Pantothenic Acid | 0.49 mg |
| Biotin | 1.8 mcg |
| Minerals | Amount |
| Sodium | 24.5 mg |
| Potassium | 67 mg |
| Chloride | 49.6 mg |
| Calcium | 45.2 mg |
| Phosphorous | 23.8 mg |
| Magnesium | 6.4 mg |
| Iron | 0.7 mg |
| Zinc | 0.5 mg |
| Copper | 0.052 mg |
| Iodine | 12.3 mcg |
| Selenium | 2.3 mcg |
| Manganese | 9 mcg |
| Fluoride | <0.015 mg |
| Others | Amount |
| Taurine | 5.8 mg |
| Choline | 20 mg |
| Inositol | 11.6 mg |
| L-Carnitine (naturally occurring) | 0.9 mg |
| Nucleotides | 2.8 mg |
* Sugars derived from milk
** 3'-GL = Galactosyllactose
Preparation Guide
400g makes 100 fl oz of formula
600g makes 150 fl oz of formula
800g makes 200 fl oz of formula
Step 1:
Sterilze bottle, nipple, and ring in boiling water for 3-min before each use.
Step 2:
Boil the water and leave it to cool for no longer than 30 minutes. Pour about half of the water into the bottle.
Step 3:
Fill the measuring spoon and level with a knife for accurate measurement. Add the quantity of milk powder indicated in the table on back of this page into the bottle.
Step 4:
Shake thoroughly. Add the rest of the water and shake again. Cool down to drinking temperature by placing bottle under cold running water. Always check the milk temperature before feeding
Feeding Chart (This table is a guide only; your baby should be fed on demand, particularly in the first few weeks, and may need more or less than the volumes stated. If you need more advice, please contact your healthcare professional).
Feeding Guide
Stage 1
| Age | Qty of Water (fl oz) | # of Measuring Spoon | Prepared Product (fl oz) | Bottles per day |
|---|---|---|---|---|
| Week 1 | Follow your doctor's advice. | |||
| Week 2~4 | 3 | 3 | 3.4 | 6~7 |
| Month 2 | 4 | 4 | 4.4 | 5~6 |
| Month 3~4 | 5 | 5 | 5.6 | 5~6 |
| After Month 4 | 6 | 6 | 6.7 | 4~5 |
Stage 2
| Age | Qty of Water (fl oz) | # of Measuring Spoon | Prepared Product (fl oz) | Bottles per day |
|---|---|---|---|---|
| After Month 6 | 5 | 5 | 5.74 | 2~3 |
| 6 | 6 | 6 | 6.76 | |
| 7 | 7 | 7 | 7.94 |
Stage 3
| Age | Qty of Water (fl oz) | # of Measuring Spoon | Prepared Product (fl oz) | Bottles per day |
|---|---|---|---|---|
| After Month 10 | 5 | 5 | 5.74 | 1~2 |
| 6 | 6 | 6 | 6.76 | |
| 7 | 7 | 7 | 7.94 |
Stage 4
| Age | Qty of Water (fl oz) | # of Measuring Spoon | Prepared Product (fl oz) | Bottles per day |
|---|---|---|---|---|
| After Month 12 | 5 | 5 | 5.74 | 2~3 |
| 6 | 6 | 6 | 6.76 | |
| 7 | 7 | 7 | 7.94 |
* Only use the scoop provided in the pack
* Do not make feeds weaker or stronger than indicated by adding extra water/scoops, and do not add anything else to milk feeds
* For hygiene reasons, always freshly prepare feeds and do not prepare in advance. Use made up feeds within 2 hours of preparation. Discard anything leftover at the end of the feed.
* Do not heat feeds in a microwave, hot spots may occur which could cause scalding
* Introduce a cup or beaker as soon as possible to prevent prolonged/frequent contact of teeth with milk feeds which may increase the risk of tooth decay
* Use sachet within 3 weeks of opening
Real Reviews from Real Customers
Baby Formula
Lebenswert Stage 2
– Hannah Piojda
Happy Girl
Lebenswert Stage 2
– Britton Seebo
Used stages 1 now stage 2
Lebenswert Stage 1
– Rick Nguyen
Great Service
HiPP HA Stage 2
– Carley Wiegner
Onto stage 3
HiPP Combiotic Stage 2
– Quinn Tran
Excellent
HiPP Combiotic Stage 2
– Guillermo Fernandez Gallardo
Easy transition
HiPP Combiotic Stage 1
– Estefania villarruel
It's good
HiPP Combiotic Stage 1
– timothy coronad
the best milk ever
Holle Goat Stage 1
– Andon Bajraktari
HiPP Combiotic Stage 2
– Sandra
Always quick delivery
HiPP Combiotic Stage 1
– Denize Maldonado
Easy and relatively fast
HiPP Combiotic Stage 3
– Patricia Valdivia
Awesome product!
Holle Goat Stage 2
– catarina jimenez santana
Fast shipping
HiPP Combiotic Stage 2 – No Starch
– Lily Lauser
Delay in shipping
Lebenswert Stage 3
– dana hurley
Sensitive baby
HiPP HA Stage 1
– Shea Warner
My baby loves it
Lebenswert Stage 1
– SARA ANN FLEMING
HiPP Combiotic Stage 2
– Eni Eni
Perfect
Holle Stage 4
– Fabienne Schmitt
Excellent Service
HiPP HA Stage 2
– oshana aziz
Needs to arrive on the 1st of the month
HiPP Combiotic Stage 1
– Jennifer Ceja
Love holle!!!
Holle Goat Stage PRE
– Brenda Comer
Slow shipping and Poor packaging
HiPP Combiotic Stage 2 – No Starch
– Karen Retana
Love OrganicBabyFood
HiPP Special Comfort – Colic Support
– Giacomo Maddaloni
Delicious
Holle Stage 3
– Daniella Lucas
Love it!
HiPP HA Stage 2
– Twila Morgan
Excellent quality
Holle Stage Pre
– Yaselynn Ugwubujo
Supplementing with Lebenswert Stage 1
Lebenswert Stage 1
– Gloria Reed
Great formula, fast shipping
HiPP Combiotic Stage PRE
– Sunny Peterson
Holle Stage 2
– Huseyn
Highly recommend
Holle Goat Stage 1
– nichole quinn
Nourishing Formula
Holle Stage 2
– Catherine A Yoder
Fast, convenient, easy
HiPP Combiotic Stage 2
– Marghee Salter
The best!
Holle Stage 4
– Jon Theodore
Convenient
Holle Goat Stage 1
– Mayra Lopez
Great seller
Holle Goat Stage 1
– Joanne Spoerl
Review for HiPP Combiotic Stage 2
HiPP Combiotic Stage 2
– Yoshua Orozco
Lebenswert bio
Lebenswert Stage 2
– Hulnara Velychko
Golden poops
HiPP Combiotic Stage 1
– Quinn Tran
This is food
Holle Goat Stage 2
– Marius Feder
Not good
Holle Stage 1
– Dung Bui
Great experience
HiPP Combiotic Stage 3
– Stine Barnes
Great Formula
Holle Goat Stage 1
– Niurka Crespo
Lebenswert
Lebenswert Stage 1
– Taylor Ritschard
Great site !
HiPP HA Stage 1
– Lindsey Smith
Great formula
Holle Goat Stage 2
– Sabina Basiorka
Holle Goat
Holle Goat Stage 1
– Nicole Groeneweg
Best online shop!
HiPP HA Stage 1
– Giacomo Maddaloni
Great product
Holle Goat Stage 2
– Marius Feder
Baby loves it
HiPP Combiotic Stage 2
– Makaila Woodard
Related products
-
Holle Goat Stage 3
Rated 4.93 out of 5$38.99 – $599.99Price range: $38.99 through $599.99 Select options This product has multiple variants. The options may be chosen on the product page -
Holle Goat Stage 2
Rated 4.92 out of 5$38.99 – $599.99Price range: $38.99 through $599.99 Select options This product has multiple variants. The options may be chosen on the product page -
HiPP Special Comfort – Colic Support
Rated 4.92 out of 5$42.99 – $543.99Price range: $42.99 through $543.99 Select options This product has multiple variants. The options may be chosen on the product page -
Holle A2 Stage 2
Rated 5.00 out of 5$36.99 – $559.99Price range: $36.99 through $559.99 Select options This product has multiple variants. The options may be chosen on the product page



