


Kendamil Premium Formula Stage 1
$52.99 – $539.99Price range: $52.99 through $539.99
Kendamil Premium First Infant Milk From Birth to 6 Months (800g) (Cow)
Suitable from Birth to 6 Months Kendamil Classic Stage 1 infant formula is carefully formulated to support your baby’s growth and development from birth up to 6 months. Made in the UK with 100% full-cream British cow’s milk, each tin provides 800g of premium nutrition for your little one.Key Benefits:
- Age Range: Perfect for newborns to infants up to 6 months old.
- Formula Type: High-quality infant formula.
- Size: Each tin contains 800g of nutritionally balanced formula.
High-Quality, Natural Ingredients
Kendamil Classic uses locally sourced, full-cream British cow’s milk, naturally rich in essential vitamins (C, A, D) and minerals like zinc, to give your baby the nutrients they need for healthy growth.Palm Oil-Free for a Greener Choice
Unlike many formulas, Kendamil is proudly palm oil-free, making it a more environmentally friendly option. Choosing palm oil-free formulas is not only better for your baby’s health but also helps protect our planet.Omega 3 & 6 from Plant Sources
Kendamil uses plant-based sources of Omega 3 and 6 instead of fish oil, making the formula vegetarian-friendly and contributing to more sustainable practices by reducing the strain on fish populations.No Preservatives or Additives
Kendamil Classic contains only pure, clean ingredients, free from preservatives, soy, sugar, maltodextrin, and GMOs. It’s a formula you can trust for your baby’s nutrition.Trusted by the British Royal Family
Kendamil is proud to be trusted by the British royal family, reflecting its commitment to providing high-quality, nutritionally balanced infant formulas.Important Notice
Parents are advised to choose infant formulas based on individual circumstances and in consultation with healthcare professionals. Always follow the recommended usage guidelines provided by the formula manufacturer.Packaging Note
Please note that this item may have a propensity to dent easily. Regrettably, we cannot provide replacements or discounts for minor dents (as replacements may also be dented). Rest assured, we meticulously inspect and dispatch only brand-new, flawless products. If this poses concern, we recommend exploring alternative products in box packaging. Dented cans remain safe for consumption unless formula powder is exposed to air. We appreciate your understanding.Ingredients
"Whole Milk (107g per 100g), Demineralised Whey Powder enriched in alpha-lactalbumin (from Milk), Vegetable Oils (Sunflower, Coconut, Rapeseed), Lactose (from Milk), Galacto oligosaccharides (from Milk), Skimmed Milk Powder, Calcium Citrate, Potassium Chloride, Calcium Lactate, Sodium Citrate, Choline Bitartrate, Fructo - oligosaccharides, Magnesium Chloride, Oil from the microalgae Schizochytrium sp., Sodium Ascorbate, Potassium Hydroxide, Inositol, L-Tyrosine, Oil from Mortierella alpina, Taurine, Nucleotides (Cytidine-5’-monophosphate, disodium Uridine-5’-monophosphate, Adenosine- 5’-monophosphate, disodium Inosine-5’-monophosphate, disodium Guanosine-5’ monophosphate), L-Phenylalanine, Iron Pyrophosphate, Zinc Sulphate, Vitamin E, Niacin, Calcium Pantothenate, Copper Sulphate, Thiamin, Riboflavin, Vitamin A, Vitamin B6, Manganese Sulphate, Folic Acid, Potassium Iodide, Sodium Selenite, Vitamin K, Vitamin D3, Biotin, Vitamin B12.
Allergy Advice: For Allergens please check Ingredients.
Contains:
Milk and milk products (including lactose)
Please keep in mind that this product is made to meet European standard for iron and other nutritional criteria. Because there is no global standard for such nutritional qualities, these requirements may vary by country. Customers in Australia, Canada the United States, and China may need additional supplements to match local dietary recommendations."
Nutrition facts
| Nutrients | per 100 ml or 3.38 oz/3 oz prepared |
| Energy | 67 kcal |
| Total Fat | 3.6 g |
| - Saturates | 1.2 g |
| - Unsaturates | 2.4 g |
| Total Carbs | 7.2 g |
| - Sugars | 6.8 g |
| - Lactose | 6.6 g |
| Fiber | 0.4 g |
| Protein | 1.3 g |
| - Whey protein | 0.8 g |
| - Casein protein | 0.5 g |
| Vitamins | per 100 ml or 3.38 oz/3 oz prepared |
| Vitamin A | 59 mcg RE |
| Vitamin D | 1.4 mcg |
| Vitamin E | 2.2 mg-α-TE |
| Vitamin K | 4.3 mcg |
| Vitamin C | 12 mg |
| Thiamin | 0.07 mg |
| Riboflavin | 0.16 mg |
| Niacin | 0.65 mg |
| Vitamin B6 | 0.05 mg |
| Folate (DFE) | 17 mcg |
| Vitamin B12 | 0.17 mcg |
| Pantothenic Acid | 0.5 mg |
| Biotin | 2.8 mcg |
| Minerals & Other Nutrients | per 100 ml or 3.38 oz/3 oz prepared |
| Sodium | 21 mg |
| Potassium | 71 mg |
| Chloride | 46 mg |
| Calcium | 44 mg |
| Phosphorus | 26 mg |
| Magnesium | 6.3 mg |
| Iron | 0.7 mg |
| Zinc | 0.5 mg |
| Copper | 0.053 mg |
| Iodine | 13 mcg |
| Selenium | 2.5 mcg |
| Manganese | 8 mcg |
| Fluoride | <0.015 mg |
| Taurine | 5.8 mg |
| Choline | 22 mg |
| Inositol | 13 mg |
| L-Carnitine | 1 mg |
| Nucleotides | 2.8 mg |
| α-Linolenic Acid (ALA) | 50 mg |
| Docosahexaenoic Acid (DHA - LCP) | 16.1 mg |
| Linoleic Acid (LA) | 542 mg |
| Arachidonic Acid (AA - LCP) | 8 mg |
Preparation Guide
400g makes 100 fl oz of formula
600g makes 150 fl oz of formula
800g makes 200 fl oz of formula
Step 1: Sterilze bottle, nipple, and ring in boiling water for 3-min before each use.
Step 2: Boil the water and leave it to cool for no longer than 30 minutes. Pour about half of the water into the bottle.
Step 3: Fill the measuring spoon and level with a knife for accurate measurement. Add the quantity of milk powder indicated in the table on back of this page into the bottle.
Step 4: Shake thoroughly. Add the rest of the water and shake again. Cool down to drinking temperature by placing bottle under cold running water. Always check the milk temperature before feeding
Feeding Guide
Feeding Chart
This table is a guide only; your baby should be fed on demand, particularly in the first few weeks, and may need more or less than the volumes stated. If you need more advice, please contact your healthcare professional.
Stage 1
| Age | Qty of Water (fl oz) | # of Measuring Spoon | Prepared Product (fl oz) | Bottles per Day |
|---|---|---|---|---|
| Week 1 | Follow your doctor's advice. | |||
| Week 2–4 | 3 | 3 | 3.4 | 6–7 |
| Month 2 | 4 | 4 | 4.4 | 5–6 |
| Month 3–4 | 5 | 5 | 5.6 | 5–6 |
| After Month 4 | 6 | 6 | 6.7 | 4–5 |
Stage 2
| Age | Qty of Water (fl oz) | # of Measuring Spoon | Prepared Product (fl oz) | Bottles per Day |
|---|---|---|---|---|
| After Month 6 | 5 | 5 | 5.74 | 2–3 |
| 6 | 6 | 6.76 | ||
| 7 | 7 | 7.94 |
Stage 3
| Age | Qty of Water (fl oz) | # of Measuring Spoon | Prepared Product (fl oz) | Bottles per Day |
|---|---|---|---|---|
| After Month 10 | 5 | 5 | 5.74 | 1–2 |
| 6 | 6 | 6.76 | ||
| 7 | 7 | 7.94 |
Stage 4
| Age | Qty of Water (fl oz) | # of Measuring Spoon | Prepared Product (fl oz) | Bottles per Day |
|---|---|---|---|---|
| After Month 12 | 5 | 5 | 5.74 | 2–3 |
| 6 | 6 | 6.76 | ||
| 7 | 7 | 7.94 |
* Only use the scoop provided in the pack.
* Do not make feeds weaker or stronger than indicated by adding extra water/scoops, and do not add anything else to milk feeds.
* For hygiene reasons, always freshly prepare feeds and do not prepare in advance. Use made-up feeds within 2 hours of preparation. Discard any leftover feed.
* Do not heat feeds in a microwave – hot spots may occur which could cause scalding.
* Introduce a cup or beaker as soon as possible to avoid prolonged contact of teeth with milk, which may increase the risk of tooth decay.
* Use sachet within 3 weeks of opening.
Real Reviews from Real Customers
Baby Formula
Lebenswert Stage 2
– Hannah Piojda
Happy Girl
Lebenswert Stage 2
– Britton Seebo
Used stages 1 now stage 2
Lebenswert Stage 1
– Rick Nguyen
Great Service
HiPP HA Stage 2
– Carley Wiegner
Onto stage 3
HiPP Combiotic Stage 2
– Quinn Tran
Excellent
HiPP Combiotic Stage 2
– Guillermo Fernandez Gallardo
Easy transition
HiPP Combiotic Stage 1
– Estefania villarruel
It's good
HiPP Combiotic Stage 1
– timothy coronad
the best milk ever
Holle Goat Stage 1
– Andon Bajraktari
HiPP Combiotic Stage 2
– Sandra
Always quick delivery
HiPP Combiotic Stage 1
– Denize Maldonado
Easy and relatively fast
HiPP Combiotic Stage 3
– Patricia Valdivia
Awesome product!
Holle Goat Stage 2
– catarina jimenez santana
Fast shipping
HiPP Combiotic Stage 2 – No Starch
– Lily Lauser
Delay in shipping
Lebenswert Stage 3
– dana hurley
Sensitive baby
HiPP HA Stage 1
– Shea Warner
My baby loves it
Lebenswert Stage 1
– SARA ANN FLEMING
HiPP Combiotic Stage 2
– Eni Eni
Perfect
Holle Stage 4
– Fabienne Schmitt
Excellent Service
HiPP HA Stage 2
– oshana aziz
Needs to arrive on the 1st of the month
HiPP Combiotic Stage 1
– Jennifer Ceja
Love holle!!!
Holle Goat Stage PRE
– Brenda Comer
Slow shipping and Poor packaging
HiPP Combiotic Stage 2 – No Starch
– Karen Retana
Love OrganicBabyFood
HiPP Special Comfort – Colic Support
– Giacomo Maddaloni
Delicious
Holle Stage 3
– Daniella Lucas
Love it!
HiPP HA Stage 2
– Twila Morgan
Excellent quality
Holle Stage Pre
– Yaselynn Ugwubujo
Supplementing with Lebenswert Stage 1
Lebenswert Stage 1
– Gloria Reed
Great formula, fast shipping
HiPP Combiotic Stage PRE
– Sunny Peterson
Holle Stage 2
– Huseyn
Highly recommend
Holle Goat Stage 1
– nichole quinn
Nourishing Formula
Holle Stage 2
– Catherine A Yoder
Fast, convenient, easy
HiPP Combiotic Stage 2
– Marghee Salter
The best!
Holle Stage 4
– Jon Theodore
Convenient
Holle Goat Stage 1
– Mayra Lopez
Great seller
Holle Goat Stage 1
– Joanne Spoerl
Review for HiPP Combiotic Stage 2
HiPP Combiotic Stage 2
– Yoshua Orozco
Lebenswert bio
Lebenswert Stage 2
– Hulnara Velychko
Golden poops
HiPP Combiotic Stage 1
– Quinn Tran
This is food
Holle Goat Stage 2
– Marius Feder
Not good
Holle Stage 1
– Dung Bui
Great experience
HiPP Combiotic Stage 3
– Stine Barnes
Great Formula
Holle Goat Stage 1
– Niurka Crespo
Lebenswert
Lebenswert Stage 1
– Taylor Ritschard
Great site !
HiPP HA Stage 1
– Lindsey Smith
Great formula
Holle Goat Stage 2
– Sabina Basiorka
Holle Goat
Holle Goat Stage 1
– Nicole Groeneweg
Best online shop!
HiPP HA Stage 1
– Giacomo Maddaloni
Great product
Holle Goat Stage 2
– Marius Feder
Baby loves it
HiPP Combiotic Stage 2
– Makaila Woodard
Related products
-
HiPP Combiotic Stage 1
Rated 4.90 out of 5$42.99 – $543.99Price range: $42.99 through $543.99 Select options This product has multiple variants. The options may be chosen on the product page -
Holle Stage 1
Rated 4.91 out of 5$29.99 – $459.99Price range: $29.99 through $459.99 Select options This product has multiple variants. The options may be chosen on the product page -
HiPP Combiotic 1 Year & Up
Rated 4.84 out of 5$42.99 – $543.99Price range: $42.99 through $543.99 Select options This product has multiple variants. The options may be chosen on the product page -
Holle Goat Stage 2
Rated 4.92 out of 5$38.99 – $599.99Price range: $38.99 through $599.99 Select options This product has multiple variants. The options may be chosen on the product page



