...

Your account Login

Home Kendamil Comfort Formula
Kendamil Comfort Formula (800g)

Kendamil Comfort Formula

Price range: $56.99 through $599.99

Free 1-4 Business days Express Shipping on orders above $100

EU Express Priority

Fastest shipping available

Best prices

Save with bulk orders and subscriptions

Freshest Formula

Only the newest batches for your baby

Trusted by Parents

Over 6,000 verified 5-star reviews

SKU: 5056000505422 Categories: , ,
 

Kendamil Comfort From Birth to 12 Months (800g)

Discover Kendamil Comfort — a tailored solution designed to meet the unique nutritional requirements of children from birth to 12 months of age. Formulated as a food for special medical purposes, Kendamil Comfort is recommended and monitored by healthcare professionals. This specialized formula is ideal for managing constipation and colic through controlled dietary nutrition, offering targeted support for little ones who need it most. Given the diverse causes of digestive discomfort, it’s essential that usage is guided by pediatricians to ensure optimal care and results.

Key Benefits

  • Suitable during episodes of colic and constipation
  • Features partially hydrolyzed protein for easier digestion
  • Contains reduced lactose content1

Important Notice

Parents are strongly advised to choose infant formulas based on individual medical needs and always in consultation with healthcare professionals. Follow the usage guidelines provided by the manufacturer to ensure safe and effective use.

Packaging Note

Please note that tins may dent easily. We do not provide replacements or discounts for minor dents (replacements may also arrive dented). All products are thoroughly inspected and dispatched brand-new. If this is a concern, we recommend considering alternatives in box packaging. Dented cans remain safe unless the powder is exposed to air. Thank you for your understanding.
Ingredients
Nutrition facts
Preparation Guide

Real Reviews from Real Customers

5856 Reviews
August 1, 2025

Baby Formula

Lebenswert Stage 2

Lebenswert Stage 2

We’ve used for both our kiddos now and love it.

– Hannah Piojda

July 31, 2025

Happy Girl

Lebenswert Stage 2

Lebenswert Stage 2

We were excited to find this formula because it is coconut free and the cost is more affordable than the other formulas we were able to find without coconut.

– Britton Seebo

July 31, 2025

Used stages 1 now stage 2

Lebenswert Stage 1

Lebenswert Stage 1

My baby loves this formula. He had issues with the over the counter ones. Since taking stage 1, we’ve not turned back.

– Rick Nguyen

July 30, 2025

Great Service

HiPP HA Stage 2

HiPP HA Stage 2

Fast & easy ordering and delivery!

– Carley Wiegner

July 29, 2025

Onto stage 3

HiPP Combiotic Stage 2

HiPP Combiotic Stage 2

Our baby has been on this since 2 mo old and he's sturdy, less gassy, and drinks the closest milk to breast milk once I got back to work. He looks like he's about to eat sandwiches soon not milk.

– Quinn Tran

July 28, 2025

Excellent

HiPP Combiotic Stage 2

HiPP Combiotic Stage 2

We used Stage 1 too. Excellent quality our baby loves it!

– Guillermo Fernandez Gallardo

July 28, 2025

Easy transition

HiPP Combiotic Stage 1

HiPP Combiotic Stage 1

My baby has been breastfeeding only. I introduced him Hipp Stagec1 and he loved it. Also, he did not have any reaction, he digested super easy.

– Estefania villarruel

July 25, 2025

It's good

HiPP Combiotic Stage 1

HiPP Combiotic Stage 1

Solid product, baby is growing fast with this.

– timothy coronad

July 23, 2025

the best milk ever

Holle Goat Stage 1

Holle Goat Stage 1

We love this company and we recommend to all we know

– Andon Bajraktari

July 23, 2025

HiPP Combiotic Stage 2

HiPP Combiotic Stage 2

Excellent!

– Sandra

July 22, 2025

Always quick delivery

HiPP Combiotic Stage 1

HiPP Combiotic Stage 1

Quick delivery, great quality and great customer service

– Denize Maldonado

July 21, 2025

Easy and relatively fast

HiPP Combiotic Stage 3

HiPP Combiotic Stage 3

Once you setup the order, the process is fast and easy. However, once it’s time to order the next shipment, you have to request a new link to submit the order. It might take an extra couple of days.

– Patricia Valdivia

July 20, 2025

Awesome product!

Holle Goat Stage 2

Holle Goat Stage 2

After almost a year of spit ups, they are gone!

– catarina jimenez santana

July 20, 2025

Fast shipping

HiPP Combiotic Stage 2 – No Starch

HiPP Combiotic Stage 2 – No Starch

I’ve ordered twice and both times have been quick shipping. The second batch did get delivered to another house (via UPS) and the formula boxes were dented but the shipping box did not show any damages.

– Lily Lauser

July 12, 2025

Delay in shipping

Lebenswert Stage 3

Lebenswert Stage 3

Hi! Overall the product is great but i always use your site because of the consistency in delivery time usually only being 2 days, lately it’s been over a week. Any reason for this?

– dana hurley

July 11, 2025

Sensitive baby

HiPP HA Stage 1

HiPP HA Stage 1

My baby does great on HIPP HA and she has a very sensitive tummy to my breast milk

– Shea Warner

June 22, 2025

My baby loves it

Lebenswert Stage 1

Lebenswert Stage 1

Good. Shopping is quick!

– SARA ANN FLEMING

June 22, 2025

HiPP Combiotic Stage 2

HiPP Combiotic Stage 2

Amazing formula! Fast delivery!

– Eni Eni

June 19, 2025

Perfect

Holle Stage 4

Holle Stage 4

My Little Girl loves the milk it’s the best

– Fabienne Schmitt

June 19, 2025

Excellent Service

HiPP HA Stage 2

HiPP HA Stage 2

Very easy, clean and smooth on the stomach.

– oshana aziz

June 18, 2025

Needs to arrive on the 1st of the month

HiPP Combiotic Stage 1

HiPP Combiotic Stage 1

I would like my formula to arrive the 1st how can we do that

– Jennifer Ceja

June 15, 2025

Love holle!!!

Holle Goat Stage PRE

Holle Goat Stage PRE

I’ve used holle goat milk for my 2 previous babies. I absolutely loved it never had a problem with it and my kids never had any problems drinking it… recently bought some for my new born just in case.. such a great product

– Brenda Comer

June 14, 2025

Slow shipping and Poor packaging

HiPP Combiotic Stage 2 – No Starch

HiPP Combiotic Stage 2 – No Starch

Not too happy. Took a while for the order to be shipped after order was placed and took a while to arrive as well. Also, horrible packaging. Just one cheap tape to close the box together. My box came open and the box inside with the formula ine of those boxes was ripped as well. Won’t order from here again

– Karen Retana

June 14, 2025

Love OrganicBabyFood

HiPP Special Comfort – Colic Support

HiPP Special Comfort – Colic Support

Couldn’t be happier. Great service, most times delivered overnight, great deals when buying in bulk.

– Giacomo Maddaloni

June 10, 2025

Delicious

Holle Stage 3

Holle Stage 3

My baby loves this formula! Amazing quality with great delivery service! Thank you!

– Daniella Lucas

June 10, 2025

Love it!

HiPP HA Stage 2

HiPP HA Stage 2

Item was shipped quickly, and except in excellent condition.

– Twila Morgan

June 10, 2025

Excellent quality

Holle Stage Pre

Holle Stage Pre

Loved that it came so quickly and my baby is having a smooth transition.

– Yaselynn Ugwubujo

June 3, 2025

Supplementing with Lebenswert Stage 1

Lebenswert Stage 1

Lebenswert Stage 1

I used this milk with my first born and it was the solution to many of our feeding problems that came with transitioning from breastmilk to formula. With my second born, I decided to supplement breastfeeding with formula since the beginning. The baby takes both “milks” perfectly, no fussiness or gas or colic. And I am super calm to know the quality of the ingredients of the formula, therefore feel “less guilty” about not exclusively breastfeeding.

– Gloria Reed

June 3, 2025

Great formula, fast shipping

HiPP Combiotic Stage PRE

HiPP Combiotic Stage PRE

Started using this formula for my baby when he was 4 weeks old. It was an easy transition from breast milk for him. Shipping is always very fast and on time. They also have the best unit price compared to other sellers.

– Sunny Peterson

May 28, 2025

Holle Stage 2

Holle Stage 2

I liked

– Huseyn

May 24, 2025

Highly recommend

Holle Goat Stage 1

Holle Goat Stage 1

I wanted something supplemental of breastmilk for when I drink wine. The ingredients are top notch and this is the only formula my baby would take. We tried 2 other brands before this one and he would not drink it. Thank you♡

– nichole quinn

May 24, 2025

Nourishing Formula

Holle Stage 2

Holle Stage 2

Love that have a great tasting formula that my baby loves!!! And he doesn't look formula fed.

– Catherine A Yoder

May 24, 2025

Fast, convenient, easy

HiPP Combiotic Stage 2

HiPP Combiotic Stage 2

Easy ordering process and fast, free shipping!

– Marghee Salter

May 24, 2025

The best!

Holle Stage 4

Holle Stage 4

As good as it gets

– Jon Theodore

May 17, 2025

Convenient

Holle Goat Stage 1

Holle Goat Stage 1

Great formula, easy tracking! Fast shipping!

– Mayra Lopez

May 17, 2025

Great seller

Holle Goat Stage 1

Holle Goat Stage 1

Plan on buying again. Speedy shipping.

– Joanne Spoerl

May 17, 2025

Review for HiPP Combiotic Stage 2

HiPP Combiotic Stage 2

HiPP Combiotic Stage 2

I've been really happy with my experience ordering HiPP Combiotic Stage 2 from Organic Baby Food. The product arrived right on time, which gave me peace of mind as a parent relying on timely deliveries. Everything was well-packaged, fresh, and exactly as described. This formula has worked wonderfully for my baby, gentle on the tummy and made with high-quality organic ingredients I can trust. I also appreciate how reliable Organic Baby Food has been with their service. I’ll definitely be ordering from them again!

– Yoshua Orozco

May 17, 2025

Lebenswert bio

Lebenswert Stage 2

Lebenswert Stage 2

Very good formula. My daughter was allergic to others. And this one suited her. My older son also grew up on this formula.

– Hulnara Velychko

May 17, 2025

Golden poops

HiPP Combiotic Stage 1

HiPP Combiotic Stage 1

Husband and I tried 8 different formulas before we found out about hipp. I was combo feeding baby. His poops with this formula was the closest to with my breast milk. Also he was less gassy outside of just using the laxative similac formula. Really happy I don’t have to feed him super processed American formula. It’s worth it!

– Quinn Tran

May 17, 2025

This is food

Holle Goat Stage 2

Holle Goat Stage 2

Love this product. My child enjoys the food and growing strong and healthy

– Marius Feder

May 15, 2025

Not good

Holle Stage 1

Holle Stage 1

The customer service is not good. The product gave my baby bad bowel movement

– Dung Bui

May 13, 2025

Great experience

HiPP Combiotic Stage 3

HiPP Combiotic Stage 3

I love this formula and I enjoy the short shipping time and price of the product.

– Stine Barnes

May 13, 2025

Great Formula

Holle Goat Stage 1

Holle Goat Stage 1

Holle goat was recommend by a friend and I’m so glad we tried it. The taste and smell are great, and our baby took to it immediately without any issues. I definitely recommend!

– Niurka Crespo

May 7, 2025

Lebenswert

Lebenswert Stage 1

Lebenswert Stage 1

Our baby loves the formula. It is great knowing our baby is drinking a safe mixture.

– Taylor Ritschard

May 6, 2025

Great site !

HiPP HA Stage 1

HiPP HA Stage 1

Have had a great experience so far! Fast shipping and great customer service !

– Lindsey Smith

May 3, 2025

Great formula

Holle Goat Stage 2

Holle Goat Stage 2

This is my third child that I have been using this formula with! We have used the goat and the cow formulas and my kids have loved it. Thank you!

– Sabina Basiorka

April 24, 2025

Holle Goat

Holle Goat Stage 1

Holle Goat Stage 1

My little one had mild reactions to the cows milk so we switched the the goats milk and she is loving it.

– Nicole Groeneweg

April 24, 2025

Best online shop!

HiPP HA Stage 1

HiPP HA Stage 1

Super happy with Organic Food Shop. Fast, reliable, and professional. Highly recommend!

– Giacomo Maddaloni

April 23, 2025

Great product

Holle Goat Stage 2

Holle Goat Stage 2

Baby loves this food. So glad we found you

– Marius Feder

April 22, 2025

Baby loves it

HiPP Combiotic Stage 2

HiPP Combiotic Stage 2

This is the formula I supplemented my first son on once he turned 6 months and my second loves it as well

– Makaila Woodard

Shop by Brand

Shop by Age

0-6 Month

Stage Pre & 1

Shop now

6-10 Month

Stage 2

Shop now

10-12 Month

Stage 3

Shop now

12+ Month

Stage 4

Shop now